Truck Mounted Workover Rig Xj150 Xj250 Xj350
Truck Mounted Workover Rig Xj150 Xj250 Xj350
Product Description
The XJ250 truck mounted workover unit adopts single drum draw-works, hydraulic telescopic double (or single) section mast, economical and practical Cummins engine, Winstar hydraulic transmission case. It has the advantages of simple structure, good transportation performance and easy for filed installation and maintenance, etc.
Truck Mounted Workover Rigs
Description
XJ250 Workover Rig (Overhaul)
XJ250 Workover Rig (Servicing)
Workover Depth
3,200m(10,500ft, 2-7/8” DP)
2,000m(6,560ft, 2-7/8” DP)
Servicing Depth
3200m (10,500ft, 2-7/8”EUE Tubing)
Rated Hook Load
400kN (90,000 lbf)
Max. Hook Load
735kN (165,000 lbf )
675kN (151,700 lbf)
Traveling System
3*4 {Φ22mm (7/8”) Wireline)
Hook Hoisting Speed
1.5m/s (4.92ft/s)
Overall Dimensions(l*w*h)
18.5*2.9*4.2m60.7*9.5*13.8ft
16.5*2.9*4.2m54.1*9.5*13.8ft
Weight
50,000kg (110,230 lb)
45,000kg (99,200lb)
Max. Travel Speed
60km/h (37mph), but limit 45km/h(28mph)
Carrier
Self-propeller 10*8
Self-propeller 6/4
Engine Model and Rated Power
Caterpillar C9/ATAAC260kW(350hp/2100rpm)
Yingpai Drilling Machinery is a leading supplier of Xj250 Truck Mounted Workover Rig. We can provide high performance Drilling Rig for sale as required to meet different tasks. Please contact us at anytime for further information you need.